Bathroom Renovation Cost Calculator

Estimates the cost of a bathroom renovation in Australia from floor area, type of job, finish quality and fixtures, broken down by component.

In a 5 m² bathroom with a full mid-range renovation, the work covers about 23 m² of tiled surface: 5 m² of floor and roughly 18 m² of wall tiling up to 2.2 m high. Three fixtures are replaced in that scenario, a toilet suite, a basin and a shower base, so the estimate is split into the tiled area, the fixtures and the tapware.

The type of job changes the scope more than any other factor. A cosmetic refresh leaves the tiles and plumbing in place and focuses on paint, accessories and new tapware. A mid-range renovation removes the existing tiles, adds new waterproofing and retiles the walls and floor. A full renovation also moves plumbing to new positions, which widens the work to include pipes, walls and the surfaces around them. Finish quality, meaning tiles, fixtures and tapware, is the second main variable.

Enter the bathroom floor area in square metres, measured internally from wall to wall. Then choose the renovation type, the finish quality, and whether the fixtures and tapware are being replaced. The calculator returns a total cost broken down by component, so you can see which part of the budget is driving the figure and which items you can change.

Treat the result as a planning estimate, not a quote. Floor area is only one input. Labour and materials are both included in the base rate, and costs also depend on the state or territory, whether the job is in a capital city or a regional centre, and the condition of the walls and floor found once the old tiles are removed.

The result updates automatically.

Small toilet: 2–4 m² (about 22–43 sq ft). Full bathroom: 4–10 m² (about 43–108 sq ft).

Renovation costs in Australia vary by capital city and region, and by the tier of tiles and fixtures chosen. Dimensions follow metric convention: floor area in square metres, wall tiling up to about 2.2 m high. Enter your own quoted figures to refine the estimate.

Toilet, basin and shower tray or bath.

Basin tap and shower or bath mixer.

Estimated cost

~$4,525

Mid-range · Mid-range · 5.0 m²

Building work and base materials
$3,000
Sanitaryware
$1,100
Taps and mixers
$425
Cost per unit of area (estimate)
$905/m²

Turn this calculation into a quote for your client

We're building a tool for professionals. Be among the first to try it.

Share

How it works

1

Enter the bathroom floor area in square metres, measured internally from wall to wall.

2

Select the renovation type: cosmetic (paint and accessories only), mid-range (tiling and fixtures) or full (everything, including any relocation of plumbing).

3

Choose the finish quality: economy, mid-range or premium.

Formula

C = A × b + L + T
C — total estimated cost of the renovation
A — bathroom floor area, measured internally wall to wall (m²)
b — base cost per m², covering labour (demolition, waterproofing, tiling, installation) and building materials; varies with the type of job and the finish quality
L — cost of the toilet suite, basin and shower base or bath; zero if the existing fixtures stay
T — cost of the tapware and mixers; zero if the existing tapware stays

How the calculation works

Bathroom renovation cost: what drives the budget

Renovating a bathroom is one of the most visible jobs you can do to a home, and one of the easiest to go over budget. The difficulty lies in what sits behind the tiles: old pipework, deteriorated render or plasterboard, and water damage that was patched rather than fixed. Many homes in the older suburbs of Sydney, Melbourne, Brisbane and Adelaide were built decades ago, so surprises once the walls are opened are common rather than rare. The calculator gives a planning estimate that makes the main cost drivers visible, but it cannot see what is hidden inside the wall cavity.

The type of job defines the budget

The renovation type has the largest effect on the total.

A cosmetic renovation leaves the tiles and plumbing alone. The focus is on painting with a moisture-resistant paint suited to wet areas, replacing accessories such as towel rails, toilet roll holders, mirrors and lighting, and fitting new tapware. A new toilet suite is sometimes added. This option suits a bathroom that is in sound condition but looks dated, or a budget that cannot stretch further. Select this option in the calculator to see the matching estimate.

A mid-range renovation is the most common choice when people say they are doing up the bathroom. It includes removing all existing wall and floor tiles, installing new waterproofing, retiling, and replacing the toilet suite, basin, shower base and tapware. Tile material and tiling labour set most of the cost of this tier, and both rise with the tiled area and with the size and type of tile chosen.

A full renovation covers everything in the mid-range tier and adds structural or service changes. Typical examples are moving the toilet, basin or shower to a new position, extending or re-routing hot and cold water and waste pipes, adding a circuit for an exhaust fan or heated towel rail, and in some cases removing part of a wall. This is the most expensive option. The base work alone costs substantially more than a mid-range job of the same size, before any fixtures are chosen.

Floor area drives the base rate

The base rate is a cost per square metre, so the base term A × b grows in step with floor area. Labour and materials are both included in that rate, so the estimate scales with area as a whole. The material that most clearly grows with area is the tile and waterproofing, because the membrane must cover every wet-area surface, floor and walls up to the required height.

In a 5 m² bathroom, wall tiling up to 2.2 m high comes to roughly 18 m² of surface, so in this example the wall area is more than three times the floor area. Tile choice changes the material cost a great deal. Economy ceramic tiles cost far less than large-format rectified porcelain, such as 600 × 1200 mm tiles, which can add considerably to the tile material bill for the same area. Large tiles also need a flatter substrate and more skilled setting, so labour can rise as well.

Fixture and tapware tiers

Fixtures are priced by tier, so compare the tiers rather than individual products.

  • Economy: packaged sets with a close-coupled toilet, a pedestal basin and an acrylic shower base, widely available from hardware and bathroom retailers.
  • Mid-range: the most common choice for standard renovations, typically a close-coupled or wall-hung toilet, a vanity basin and a tiled or acrylic shower base.
  • Premium: wall-hung toilets with concealed cisterns, inset or semi-inset basins, glass shower screens, walk-in showers and rain-style shower heads.

For toilets and tapware, check the WELS water efficiency star rating, a government labelling scheme, and read the manufacturer's warranty terms in the product data sheet rather than assuming a warranty period.

Waterproofing is the item most often underestimated

Wet areas in Australian homes must be waterproofed so that water does not penetrate the building structure. The National Construction Code (NCC), maintained by the Australian Building Codes Board, sets the performance requirements for wet areas in residential buildings, and the Australian Standard AS 3740, Waterproofing of domestic wet areas, sets out how those requirements are met.

Waterproofing failures rarely show up on completion. Water that leaks through a poorly sealed floor or wall can take years to appear as staining, soft flooring or damage to the ceiling of the unit below. This is why the membrane is always included in the estimate, whatever the renovation type. Apply the membrane exactly as the product data sheet specifies, including the number of coats and the curing time before tiling starts. Ask the installer for written confirmation that the work complies with AS 3740, and for the warranty terms in writing.

Trims, sealants and the small items

Smaller items add up quickly when they are not in the budget: movement joints between wall and floor, internal corner sealing, tile trims and edge profiles where the bathroom meets the hallway, sealant around the basin and shower base, and final painting of the ceiling and doorframe. The base rate is intended to cover the common items for the chosen tier, but if you are comparing against a quote, check whether the quote covers them.

Labour and location

Labour rates differ between capital cities and regional centres, and between trades. Get written quotes from several licensed tradespeople and compare them with the figures the calculator produces. Enter your own quoted figures to refine the estimate.

Edge cases and how the formula behaves

The formula is C = A × b + L + T. Each term reflects one part of the job. Zero is a valid input for each of the two optional terms, L and T.

  • If the existing toilet suite, basin and shower base stay, the fixture term L is zero. The estimate then covers only the renovation work and any tapware.
  • If the existing tapware stays, T is zero.
  • If both L and T are zero, the estimate reduces to area multiplied by the base rate, which fits a cosmetic renovation that keeps the existing fixtures and taps.
  • The area A must be a positive value in square metres. An area of zero gives a total made up only of L and T, which does not describe a real bathroom, and negative values have no physical meaning, so the calculator should not be used with them.
  • Because the base rate is a cost per square metre, the calculator does not add separate charges for items that do not change with room size, such as a call-out fee, delivery or the connection of a toilet suite. In a very small room these can make the real cost per square metre higher than the estimate, so add them from your quotes.

The formula is linear in A and in b. Doubling the area doubles the base term but leaves L and T unchanged, which helps you see how much of the total is driven by area and how much by fixtures.

When to use the calculator, and when not to

Use the calculator to compare renovation types, see which part of the budget is most sensitive to change, or set a realistic planning figure before asking for quotes. It works well for a standard bathroom in a house or apartment with no unusual constraints.

Do not use it as the basis for a fixed-price contract, to check whether a specific quote is fair, or for a bathroom with known structural movement, mould or water damage. Those situations need a site inspection by a licensed trade or a building inspector first, because the scope may change once the problem is exposed.

Approvals and licensing

  • Plumbing: plumbing work must be carried out by a licensed plumber and must comply with AS/NZS 3500 (plumbing and drainage) and the Plumbing Code of Australia, as enforced by your state or territory plumbing regulator.
  • Electrical: new circuits and fittings, such as exhaust fans and heated towel rails, must be installed by a licensed electrician to AS/NZS 3000 (the Wiring Rules), which requires residual current device (RCD) protection for bathroom circuits.
  • Structural changes: removing or opening walls, or altering structural elements, may require a building permit and certified plans from a registered professional. Ask your local council or a private building certifier what applies in your area.
  • Strata and units: in strata buildings, changes that affect common property, such as shared stacks or pipes, need approval from the owners corporation or body corporate, depending on the state.
  • Licensed builders: check whether your contractor must hold a builder's licence. Licensing requirements and any value thresholds are set by each state and territory, so confirm them with the building regulator in your state or territory before you engage a contractor.

These rules differ between states and territories, so treat this list as a checklist to verify rather than a complete statement of requirements.

Common mistakes to avoid

  • Measuring the outside of the room, or measuring at skirting height, rather than internal wall to wall.
  • Leaving waterproofing, sealing and trims out of the budget.
  • Assuming the existing plumbing is sound. Corroded galvanised pipes and failed fittings are often found only after demolition.
  • Choosing large-format tiles without checking that the substrate is flat enough to take them.
  • Comparing quotes that cover different scopes, for example one that includes waterproofing and rubbish removal and one that does not.
  • Overlooking access constraints, such as a bathroom on an upper floor of a unit block with restricted lift access, which can add labour time.

Scheduling the work

Good tradespeople often book weeks ahead, so plan the timetable early. A typical sequence runs demolition, plumbing and electrical rough-in, waterproofing, tiling, fixture installation, then final sealing and painting. Each stage depends on the one before it. Tiling cannot start until the membrane has cured, and fixtures cannot be fitted until the tiles and sealants are finished. A delay early in the sequence therefore moves everything after it, so build a contingency into both the timetable and the budget.

The calculator estimates cost, not time. Use the estimate to plan the budget, then confirm timing with your tradespeople.

Frequently asked questions

What determines the cost of a bathroom renovation in Australia?

The renovation type has the largest effect, followed by the tiled area and the finish quality. A cosmetic refresh that keeps the existing tiles and plumbing is the lowest-cost option. A mid-range renovation with new tiles, waterproofing and fixtures costs substantially more, and a full renovation that moves plumbing is the most expensive. Enter your floor area, then select the type of job and the finish tier in the calculator to see how each part of the work contributes to the estimate.

What does a full bathroom renovation include?

A full renovation covers demolition of the existing tiles and fittings, plumbing and drainage changes, new waterproofing to the walls and floor as set out in AS 3740, new wall and floor tiling, electrical work for lighting, exhaust fans or heated towel rails, a toilet suite, basin, shower base or bath, tapware, and final sealing, trims and painting. Some jobs also include structural changes such as removing part of a wall, which may need approval from the local council or a building certifier.

How long does a bathroom renovation take?

A cosmetic refresh takes days rather than weeks. A mid-range renovation, with demolition, waterproofing, tiling and fixture installation, typically takes a few weeks, and the waterproofing membrane must cure before tiling can start. A full renovation that relocates plumbing can take several weeks or longer. Timing depends on the availability of tradespeople, the curing time of the membrane and any approvals that must be obtained first.

Is it worth renovating a bathroom before selling a home?

Often, yes, but it depends on the current condition, the price segment of the property and the local market. A clean, updated bathroom helps a property present well and can shorten the time it spends on the market, particularly in suburbs where buyers compare many listings. Match the scope to the segment of the home: a mid-range renovation in an average property usually makes more sense than premium fittings in a lower-value one. Ask a local real estate agent for their view before committing to the work.

Which fixture quality levels are available in Australia?

Fixtures are generally sold in economy, mid-range and premium tiers. Economy sets are widely available and suit a standard renovation on a tight budget. Mid-range fixtures are the most common choice. Premium products include concealed cisterns, inset basins and glass shower screens. For toilets and tapware, check the WELS water efficiency star rating, a government labelling scheme, and the warranty terms in the product data sheet. Choose the tier you want in the calculator and compare it against the fixtures in your written quotes.

When is a building permit or design needed for a bathroom renovation?

Whether a building permit or certified plans are needed depends on the scope of the work and on your state or territory, so confirm with your local council or a private building certifier before you start. Work that involves removing or opening walls, or changing the structure, is the case most likely to need them. Plumbing and electrical work must be done by licensed tradespeople, and work in strata buildings may need approval from the owners corporation or body corporate.

Related calculators

View all Renovation & Systems calculators →

By RivoCalc · Reviewed under our editorial methodology · Updated 3 June 2026

This calculator gives an estimate for planning purposes only. Actual costs depend on site conditions, hidden defects such as damaged subfloors or old pipework, the materials chosen, local labour rates and the scope agreed with your tradespeople. Get itemised written quotes from licensed trades before setting a budget or signing a contract.