Kitchen Renovation Cost Calculator (Australia)

Estimates the cost of a kitchen renovation in Australia by floor area, renovation type, finish quality, cabinetry and appliances.

For a mid-range renovation of a 10 m² kitchen, the scope covers 10 m² of new flooring, about 4 linear metres of base and overhead cabinetry with a benchtop, and five appliances to install and connect: oven, cooktop, rangehood, fridge and sink.

The variable that changes the scope of works most is not the floor area but the type of renovation. In a cosmetic renovation, the existing tiles and cabinetry stay in place, and the work is limited to painting, new handles, under-cabinet lighting and, if needed, a new mixer tap. In a full renovation with relocated plumbing, the floor and wall finishes must be removed to reach the pipework, and that demolition becomes part of the job. The quality of the finishes, covering tiles, cabinetry and appliances, is the second axis of variation.

The calculator works from the floor area, the renovation type and the finish quality. It estimates the total cost and breaks it down into three parts: the works (demolition, waterproofing, tiling, basic plumbing and supporting electrical work), the cabinetry and the appliances. If the existing cabinetry or appliances are staying, leave those options off and the corresponding part of the estimate drops to zero.

Because a kitchen involves almost every trade at once, the estimate is most useful as a starting point for comparing quotes. Enter the figures from your own quotes wherever you have them, and treat the result as a planning range rather than a fixed price. A kitchen in a brick veneer house in Sydney with a concrete slab floor, or in an apartment in a strata building where the owners corporation's rules apply, can differ in cost from the same area in a different building.

The result updates automatically.

Small kitchen: 6–9 m² (about 65–97 sq ft). Medium kitchen: 10–14 m² (about 108–151 sq ft). Large kitchen: 15+ m² (about 161+ sq ft).

Demolition, tiling, plumbing and labour. Enter the base cost per square metre from your own quotes, or from current local rates for works of the chosen type and finish. The works are governed by the National Construction Code, AS/NZS 3000 for electrical wiring, AS 3740 for waterproofing of wet areas and AS/NZS 3500 for plumbing and drainage. State and territory rules and local council requirements can add to these, so check them before starting.

Cabinets, worktop and fitting. Reference value for the quality you've chosen.

Oven, hob, extractor, fridge and dishwasher. Reference value for the quality chosen.

Estimated cost

~$8,650

Mid-range · Mid-range · 10.0 m²

Building work and base materials
$3,900
Kitchen cabinetry
$4,750
Cost per unit of area
$865/m²

Turn this calculation into a quote for your client

We're building a tool for professionals. Be among the first to try it.

Share

How it works

1

Measure the kitchen floor area in square metres, wall to wall on the inside (length × width).

2

Choose the renovation type: cosmetic (paint and finishes only), mid-range (tiling and cabinetry) or full (everything, including possible relocation of plumbing).

3

Select the finish quality: budget, mid-range or premium.

Formula

C = A × b + M + E
C — total estimated cost
A — kitchen floor area, measured wall to wall on the inside (m²)
b — base cost per m², covering labour (demolition, waterproofing, tiling, basic plumbing and supporting electrical work) and building materials; varies with the type of renovation and the finish quality
M — cost of kitchen cabinetry (base and overhead cabinets, benchtop and installation); zero if the existing cabinetry stays
E — cost of appliances (oven, cooktop, rangehood, fridge and sink); zero if the existing appliances stay

How the calculation works

Kitchen Renovation Cost: what drives the budget in Australia

A kitchen renovation is one of the most complicated jobs a homeowner takes on. Unlike repainting a room or replacing the carpet, it brings several trades together at once: plumber, electrician, tiler, carpenter or cabinet maker, and often a stonemason to fit the benchtop. Coordinating five or six trades in a 10 m² room is the main reason budgets grow, and it is why unexpected conditions are almost always found once walls and floors are opened.

The three renovation types and what each includes

A cosmetic renovation is the fastest and least disruptive option. It keeps the existing tiles and cabinetry and focuses on the look of the room: painting the walls with a paint suited to humid areas, replacing handles, adding under-cabinet lighting and, sometimes, replacing the mixer tap. Choose this type when the layout works and the splashback and floor are in sound condition.

A mid-range renovation is the most common choice when people say they are doing the kitchen. It includes removing the existing wall tiles, preparing the surfaces, waterproofing the wet areas, laying new tiles and replacing the cabinetry. Where the sink or a dishwasher sits against a wall, waterproofing should follow the requirements of the National Construction Code and AS 3740. The cost depends mainly on the area, the range of materials chosen and how much cabinetry is replaced.

A full renovation covers everything above and also changes the layout. It can involve moving the sink and its drainage, adding a water connection for a dishwasher, upgrading the switchboard to provide dedicated circuits for high-demand appliances such as the oven and cooktop, and, where a wall is not load-bearing, removing or building partitions to open the kitchen to the living area. It is the most expensive option and is substantially costlier than a mid-range renovation of the same size and finish level.

Cabinetry and benchtops: the largest variable item

For most mid-range and full renovations, cabinetry is the largest single cost item, and it is also where prices vary most.

At the budget end, flat-pack or stock cabinetry in standard sizes, with laminate or timber-look doors and a laminate or basic stone-look benchtop, is the reference for an affordable kitchen. It suits straightforward layouts where the cabinets fit standard wall lengths.

At the mid-range level, semi-custom cabinetry from local manufacturers offers stronger carcass construction, more door styles and finishes, and a wider choice of sizes. This is the segment where layout flexibility starts to matter, for example around a corner or a narrow gap beside the fridge.

At the premium end, custom cabinetry from a cabinet maker, with timber or lacquered doors, soft-close hardware, stone benchtops and integrated appliance housing, gives full control over layout and finish. It sits at the top of the price range and usually has longer lead times.

Benchtop material also changes the budget. Laminate is the lowest-cost option, while natural stone and engineered stone cost more. Stone benchtops are normally templated after the cabinets are installed, which adds a site visit and a fabrication lead time to the program, so they should be ordered early.

Appliances: buying as a package or separately

Many owners buy appliances together with the works so that the built-in oven, cooktop and rangehood fit the exact openings of the new cabinetry. The opening dimensions should be confirmed against the appliance specification before the cabinetry is manufactured, because a difference of a few millimetres can decide whether a built-in oven fits.

Appliances broadly fall into three tiers: entry-level models with basic functions, mid-range models with better finish and energy performance, and premium models for high-specification projects. The energy rating label that appears on many household appliances is a useful public reference when comparing energy use between models.

The appliance price rarely includes installation. Electrical connections for the oven, cooktop and rangehood must be carried out by a licensed electrician, and a gas cooktop requires a licensed gasfitter. Installation labour should be included in the quote for the works, so that it is not overlooked in the budget.

Costs that are often missed in the first budget

Three categories of cost appear regularly in kitchen renovations and are often absent from the initial budget.

First, finishing details: transition strips between floor coverings, silicone sealing around the benchtop and splashback, skirting or kickboards, recessed ceiling lighting to replace a central light fitting, and access panels where pipework is exposed. Individually these items are small, but together they add a significant amount if they are not planned from the start.

Second, structural surprises. When old tiles from earlier decades are removed, it is common to find damaged render or plaster, moisture from a failed seal, or old copper pipework that is worth replacing while it is accessible. A prudent budget includes a contingency reserve on top of the base cost to cover these conditions, because they are discovered only after the finishes are removed.

Third, the cost of living elsewhere during the works. A full renovation can make the kitchen unusable for several weeks. In a household without a second kitchen, the cost of takeaway meals or eating out during that period is a real item and should be planned for alongside the works.

Approvals, licensing and owners corporations

Whether a kitchen renovation needs a building approval depends on the state or territory and on the scope of the work. The National Construction Code (NCC), published by the Australian Building Codes Board, sets the national building requirements, and each state and territory applies them with its own variations. Work that removes or builds walls, moves the drainage or changes the ventilation is the most likely to need an approval, so check with the local council or a registered building surveyor before starting.

Where a wall may be load-bearing, a structural assessment by a qualified engineer is the safe course before any part of it is removed, because an unsupported load-bearing wall is a serious structural risk.

Electrical, gas and plumbing work should be carried out by licensed tradespeople, and the work must comply with AS/NZS 3000 (the Wiring Rules), AS/NZS 5601.1 (gas installations) and AS/NZS 3500 (plumbing and drainage). Licensing rules are set by each state and territory, so confirm the requirements for the property's location with the relevant state or territory building authority.

In apartments and townhouses, the owners corporation's rules, called the body corporate in some states, should be checked before any work that affects shared walls, common plumbing or ventilation shafts begins. The owners corporation can confirm what approval the building's rules require.

Edge cases and common mistakes

If the cabinetry and the appliances both stay, the calculator returns the works cost alone, which is the base rate multiplied by the area. If the area is entered as zero, the works cost is zero, so the result only has meaning once the real floor area is entered.

Several mistakes are common. Measuring the room with the existing cabinetry still in place gives the wrong area for a new layout, since the new cabinetry often extends into areas that were not measured. Choosing a cosmetic renovation when the tiles are in poor condition understates the works. Leaving out the installation of built-in appliances, forgetting the contingency reserve and comparing quotes without checking whether GST is included are also frequent sources of error. The Australian Taxation Office (ATO) publishes the GST rules that apply to building work.

This calculator is not the right tool for a heritage-listed property, a commercial kitchen or a project that changes the layout substantially. In those cases a written quote from a licensed builder, based on a site inspection, is more reliable than a model estimate.

Frequently asked questions

What determines the cost of a kitchen renovation in Australia?

The main drivers are the floor area, the type of renovation (cosmetic, mid-range or full), the quality of the finishes and whether cabinetry and appliances are included. A cosmetic renovation is the least costly because it keeps the existing tiles and cabinetry. A full renovation that moves plumbing or changes the electrical layout is the most expensive. Premium cabinetry, stone benchtops and high-specification appliances widen the range considerably. Enter your own parameters in the calculator to get an estimate for your kitchen.

What does a full kitchen renovation include?

A full renovation usually includes removing the existing floor and wall finishes, waterproofing wet areas under the National Construction Code and AS 3740, new tiling, moving or adding plumbing and drainage points, upgrading the electrical circuits for high-demand appliances, installing new cabinetry and benchtops, fitting built-in appliances, and the finishing details such as silicone sealing, skirting and lighting. Lead times for benchtops and cabinetry often set the overall program. A typical full renovation takes around four to eight weeks, depending on material supply and how well the trades are coordinated.

What is the difference between stock, semi-custom and custom kitchen cabinetry?

Stock cabinetry comes in standard sizes and finishes, usually from large retailers, and is the most affordable option. Semi-custom cabinetry from local manufacturers offers more sizes, door styles and finishes, with stronger carcass construction and more flexibility in layout. Custom cabinetry is designed and built by a cabinet maker for the exact space, with full control over materials, hardware and integrated appliance housing. It sits at the top of the price range and usually has longer lead times. Comparing quotes for the same type of cabinetry from at least two suppliers makes the choice clearer.

Is it worth renovating a kitchen before selling a home?

It depends on the property. A kitchen that looks dated can slow a sale, and a well-presented kitchen helps buyers see the home's potential. A cosmetic update is generally the lowest-risk option because it improves the appearance without the cost and disruption of structural work. Premium finishes are usually justified only in higher-value homes, where buyers expect them. Ask a local selling agent to compare recent sales in the street before deciding how much to spend on the kitchen.

How long does a kitchen renovation take?

A cosmetic renovation typically takes two to five days. A mid-range renovation, including demolition, tiling and new cabinetry, usually takes two to four weeks, allowing for curing time between wet-area steps. A full renovation that relocates plumbing can take four to eight weeks, depending on how long materials such as stone benchtops and appliances take to arrive and how well the trades are coordinated. Allow extra time for the approvals stage before any work starts.

When do I need a building approval or an engineer for a kitchen renovation?

Whether a building approval is needed depends on the state or territory and on the scope of the work. Works that change walls, drainage or ventilation are the ones most likely to need one, so check with the local council or a registered building surveyor before starting. Where a wall may be load-bearing, a structural assessment by a qualified engineer should come before it is removed. In apartments and townhouses, the owners corporation's rules should be checked before work that affects shared walls or common plumbing begins, because requirements vary between states and territories.

Related calculators

View all Renovation & Systems calculators →

By RivoCalc · Reviewed under our editorial methodology · Updated 3 June 2026

This calculator gives an indicative estimate only. Actual costs vary with site conditions, the trades you engage, supplier pricing, the scope agreed in writing and the condition of existing walls, floors and pipework. Obtain at least two written quotes from licensed tradespeople before committing to a budget.