Electrical Installation Cost Calculator UK
Estimates the cost of a new-build, partial or full rewire electrical installation in the UK, including the consumer unit and certification.
For an 80 m² flat, the estimate starts from the floor area: 80 m² multiplied by the base rate per m² for the chosen type of work, plus a fixed allowance for the consumer unit and the electrical installation certificate. In a flat of that size, the design sets how many circuits are needed, with 2.5 mm² cable for socket outlets and 1.5 mm² cable for lighting. Those technical details are the basis for comparing quotes, because two offers for the same floor area can cover very different scopes.
Take a semi-detached house in Manchester with 90 m² of floor area. If the cabling is in good condition and the consumer unit is the only element that needs replacing, a partial rewire is the usual choice. If the cabling is rubber-insulated or lead-sheathed, or has been altered in ways nobody can document, a full rewire is more likely to be needed. The calculator lets you compare both scenarios by changing one selection, so the difference can be seen before any electrician visits the property.
Electrical work is hidden once the walls are closed, which is why the type of installation matters so much. A new build allows cables to be run through open walls and floors. A rewire means cutting chases into plaster and making good afterwards, which adds labour that is not visible in the finished room but appears clearly in the total. Each option therefore has a different cost per square metre, and the calculator uses separate rates for each one.
The estimate is not a quote. It applies fixed rates to each scenario and cannot see the condition of the existing wiring, the location of the consumer unit, access to the loft or subfloor, or the price of work on the day. Use the result to set a budget range and to check whether quotes are broadly in line with it. Then ask each electrician to itemise circuits, cable sizes, the consumer unit and the certificate, so that the offers can be compared on the same scope.
Certification matters as much as price. In England and Wales, most new circuits, consumer unit replacements and rewires are notifiable under Part P of the Building Regulations, and the electrician should issue an electrical installation certificate when the work is complete. A quote that leaves certification out is a reason to ask more questions before agreeing anything.
The explanation below uses metric units; the calculator works in either system.
The result updates automatically.
Total home area (all rooms added together).
A full refurbishment includes chasing and making good the walls for new cabling.
Quality affects durability and features, not safety.
Reference basis: installation rate per m², consumer unit and certificate allowance, and three-phase connection allowance, all before regional adjustment. Area is entered in square metres, the standard unit for UK building work.
Consumer unit and certification, fixed price.
Estimated total cost
£68.00/m² · ~10 circuits
- Installation (80 m²)
- £4,960.00
- Consumer unit
- £480.00
- Estimated circuits
- ~10 circuits
How it works
Formula
How the calculation works
Electrical installation cost in the UK: what drives the estimate?
The electrical installation is one of the least visible parts of a building project, and for that reason it is often underestimated. Once the plaster is closed, cable routes cannot be checked without opening the walls again, so a vague quote is easy to accept and hard to challenge later. This calculator makes the main variables explicit so that quotes from different electricians can be compared on the same basis.
The calculator builds its estimate from four inputs: the floor area of the home, the type of installation, the quality of the components and the region. It adds a fixed allowance for the consumer unit and the electrical installation certificate, and an optional allowance for a three-phase supply. The result is an indicative figure for budgeting. It is not a fixed price and does not replace a survey of the property.
Type of installation: the decision with the largest effect
The type of work has the greatest influence on the total, because it determines how much labour and making good is involved.
A new build means the walls and floors are open during construction. Cables are run directly through the structure, with no chasing and no reinstatement of finished surfaces. It is the least expensive option per square metre, and a detached house of 120 m² is a typical case for this scenario.
A partial rewire replaces the consumer unit and the main circuits, and keeps existing cabling that is sound. It suits a home where the cabling is PVC-insulated and in good condition, but the consumer unit is old, lacks RCD protection or cannot take new circuits. The cost per square metre is moderate.
A full rewire replaces all the cabling. Chases are cut into the plaster, new cable or conduit is installed, and the walls are made good before decoration. It is the most expensive option per square metre, but it gives the most complete result. It is the usual route where a condition report finds that existing rubber-insulated or lead-sheathed wiring has deteriorated, because the insulation of these materials wears with age. Its condition is established by inspection under BS 7671, not by the material alone. It is also the usual choice where the wiring has been altered in ways that cannot be documented.
Take a semi-detached house in Manchester with 90 m² of floor area. If the cabling is sound, the partial rewire option gives a realistic budget. If the cabling is rubber-insulated, the full rewire figure is the one to plan around, and the difference between the two should inform whether the wiring is replaced at the same time as other building works.
Cost components
- Type of installation: the largest variable, as explained above.
- Floor area: the total of all rooms, including hallways, landings and any loft or cellar that is wired.
- Material quality: the basic option meets BS 7671 with basic components. The standard option uses mainstream components. The premium option adds higher-end components and networked controls such as smart lighting and home automation.
- Region: electricians' labour rates vary across the UK. The calculator applies a regional factor, and higher factors apply in regions where rates are usually higher, such as London and the South East.
- Consumer unit and certificate: a fixed allowance covering the enclosure, miniature circuit breakers, RCDs and the installation certificate.
- Three-phase supply: only where needed. The connection is arranged with the local distribution network operator, which may require a supply upgrade and new metering.
How the formula works
The formula is C = (A × P + CU) × f_q × f_r + T × f_r. The expression works in three steps. First, the floor area A is multiplied by the base rate P for the chosen type of work, and the fixed allowance CU for the consumer unit and certificate is added. Second, this sum is multiplied by the material quality factor f_q and the regional factor f_r. Third, the three-phase allowance T, where it applies, is multiplied by the regional factor f_r and added to the result.
Two structural points matter when reading the result. The quality factor applies to the main installation and the consumer unit, but not to the three-phase allowance. The regional factor applies to both the main installation and the three-phase allowance. Because the fixed allowance does not scale with area, the total does not double when the floor area doubles. For an 80 m² home and a 160 m² home with the same options, the total for the larger home is less than twice the total for the smaller one.
Edge cases
- With no three-phase supply, T is zero and the last term disappears.
- The premium quality factor raises the consumer unit allowance as well as the installation, because the factor multiplies the whole bracket.
- In very small homes, the fixed allowance makes up a larger share of the total, so the cost per square metre looks higher than in a larger home.
- Changing the region changes only the regional factor. It does not reflect local differences in the supply connection beyond the three-phase allowance.
When to use this calculator
Use it at an early stage, before a survey, to set a realistic budget range. It is also useful for comparing a new build, a partial rewire and a full rewire for the same home, and for checking whether an itemised quote is broadly in line with the market. It is most valuable when walls are about to be opened for another project, because it prompts you to coordinate the electrical work at the same time.
When not to use it
Do not rely on it for commercial premises, where different requirements and inspection regimes apply. Listed and heritage buildings may need consent for alterations and specialist methods of making good, which the calculator does not reflect. It is not a tool for fault finding or for choosing the size of a single circuit. Those tasks need the design and testing carried out by a qualified person. Solar generation, battery storage and high-power charging beyond the three-phase allowance have their own requirements and are not covered.
The estimate applies across the UK, but the certification route differs between England and Wales, Scotland and Northern Ireland, so confirm the rules for your nation.
Standards and regulations
BS 7671 is the national wiring standard for electrical installations in the UK. It sets out how circuits are designed, protected and verified, and several of its requirements shape the cost directly.
Circuits must be designed for their load and protected by a suitable device. In practice, most homes have separate lighting and socket circuits, with dedicated circuits for the cooker, the shower, the immersion heater and, where planned, an electric vehicle charger.
BS 7671 requires RCD protection with a rated residual operating current of 30 mA for socket outlet circuits up to 32 A. Cable size must suit the protective device. Ring final socket circuits protected by a 32 A device commonly use 2.5 mm² cable, and lighting circuits protected by a 6 A device commonly use 1.5 mm² cable. Using cable smaller than the protective device requires is a breach of the standard and a fire risk, so any quote that relies on undersized cable to reduce material cost should be questioned.
Miniature circuit breakers used in UK installations are standardised to BS EN 60898.
Part P of the Building Regulations applies in England and Wales. Most new circuits, consumer unit replacements and rewires are notifiable work under Part P. Notifiable work must either be notified to building control in advance or be carried out by an electrician registered with a government-approved competent person scheme, which then certifies it. Scotland and Northern Ireland have their own building standards systems, and the route to certification differs.
An electrical installation certificate confirms that new work complies with BS 7671. An electrical installation condition report assesses the condition of an existing installation. Private landlords in England must have the fixed wiring inspected by a qualified person at least every five years, under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020.
Home insurance policies may set conditions about electrical work, and a claim for electrical damage can be disputed if the work was not carried out or certified properly. Check the policy wording before the work starts.
Common mistakes
The first mistake is accepting a fixed-price quote that is not itemised. A proper schedule lists the circuits, cable sizes, the consumer unit and its protective devices, the making good and the certificate. Without these items, the scope cannot be compared and extras tend to appear later.
The second is starting work without a design. For a full rewire or a consumer unit replacement, a written design or schedule of works from a competent person protects the homeowner. Without it, an electrician may choose solutions that pass a visual check but do not match the real load of the home. A badly sized installation trips the consumer unit whenever several high-load appliances run together, which is a common complaint in older homes.
The third is closing the walls before the other cabling has been coordinated. Network cables, aerial and satellite feeds, smart home sensors and CCTV cables must be routed before the plaster goes back on. Opening the walls later means cutting new chases, making good and redecorating, which costs far more than the cable itself.
The fourth is choosing on price alone. The cheapest quote may rely on undersized cable, omit the certificate or exclude the making good. Compare quotes on the same scope before comparing totals.
When to hire a professional
Electrical installation work in a home should be carried out by a competent electrician, and most significant work must be certified. Ask for proof of the electrician's registration with a competent person scheme or the local authority notification, and check that registration on the scheme's public register before agreeing a price.
For a rewire, a consumer unit replacement or a new supply, ask for a design or schedule of works, the certificate on completion and a written statement of what is included and excluded. These documents are also what buyers, surveyors and tenants ask for when a home is sold or let.
Ofgem regulates the energy networks in Great Britain. Changes to the supply, including a three-phase connection, are arranged with the local distribution network operator, which should confirm the requirement and any associated work in writing before anything is planned.
The calculator gives a starting point. The design, the quote and the certificate come from a qualified professional.
Frequently asked questions
What determines the cost of a full electrical installation in the UK?
Three factors drive the estimate most: the type of work (new build, partial rewire or full rewire), the quality of the components, and the region, because labour rates differ across the UK. The floor area multiplies the base rate, so the total rises with the area, while the fixed allowance does not change with it. A consumer unit and an electrical installation certificate are added as a fixed allowance, and a three-phase supply is added only when it is needed. The calculator applies these factors automatically, so you can change one input at a time and see its effect on the total.
What is the difference between a partial rewire and a full rewire?
A partial rewire replaces the consumer unit and the main circuits, and keeps cabling that is still sound, usually PVC-insulated cable in good condition. A full rewire replaces all the cabling, which means cutting chases into the walls, installing new cable or conduit, and making good the plaster and decoration afterwards. The cost per square metre is higher for a full rewire because of the extra labour and making-good work. A full rewire is the usual route where a condition report finds deteriorated rubber-insulated or lead-sheathed wiring, since the insulation of these materials wears with age. Use the calculator to compare both scenarios for your floor area.
How many circuits does an 80 m² home need?
There is no fixed number, because it depends on the layout and the appliances. In an 80 m² home, the design sets the number of separate circuits: typically lighting circuits, one or more ring final circuits for socket outlets, and dedicated circuits for the cooker, the shower, the immersion heater and an electric vehicle charger if one is planned. BS 7671, the national wiring standard, requires each circuit to be designed for its load and protected by a suitable device, and RCD protection is required for socket outlet circuits up to 32 A. A competent electrician confirms the final layout after a survey of the property.
When is a three-phase supply needed in a UK home?
A three-phase supply is usually needed for high-power loads, such as electric central heating, a workshop with large machinery, or an electric vehicle charger rated above about 7.4 kW. That figure is roughly the maximum for a 32 A single-phase supply at 230 V. Most flats and typical houses are supplied single-phase and do not need an upgrade. A three-phase connection is arranged with the local distribution network operator, which may need to change the supply and the metering. Ask your electrician or the network operator to confirm the requirement before you set the budget.
Do I need a registered electrician for electrical work in my home?
For most significant work in England and Wales, yes. New circuits, consumer unit replacements and rewires are usually notifiable under Part P of the Building Regulations. Such work must either be notified to building control in advance or be carried out by an electrician registered with a government-approved competent person scheme, which then certifies it. Work that is not notifiable must still comply with BS 7671. Always ask for an electrical installation certificate at completion, and check the electrician's registration before you agree a price. Scotland and Northern Ireland have their own building standards systems, so the route to certification differs there.
Why does the estimate not match the quotes I receive?
The calculator uses fixed rates for each scenario, but a quote reflects the actual condition of your wiring, access to the loft and subfloor, the layout, the specification agreed and the market at the time. Treat the result as a budget range rather than a price. If quotes differ widely, ask each electrician for an itemised schedule showing the number of circuits, the cable sizes, the consumer unit, the protective devices and the certificate. Differences in those items usually explain a gap between quotes, and a quote that is much lower than the others may leave something out.
Related calculators
View all Renovation & Systems calculators →
By RivoCalc · Reviewed under our editorial methodology · Updated 3 June 2026
This calculator provides an indicative estimate for budgeting only. Actual costs depend on the property, the condition of the existing wiring, access, local labour rates and the specification agreed with a qualified electrician. Electrical work must be designed, installed and certified in line with BS 7671 and the rules that apply in your nation.