Estimates the cost per m² of solid, engineered, laminate or mosaic parquet flooring, with waste and installation included.

For an 18 m² living room laid in a diagonal pattern, order 20.7 m² of boards (18 × 1.15). That is 15% more than the floor area, to cover the angled cuts at the edges of each row. In a straight layout, the calculator applies a 10% allowance instead, so the same room needs 19.8 m² of material.

The final cost of a timber floor rarely matches the price on the product label. Offcuts are only part of the gap. Installation labour, subfloor levelling, underlay, silicone sealant and threshold strips all add to the total, and they are easy to overlook when the first budget is drawn up. Products also differ in labour as well as material, so the cheapest product per m² is not always the cheapest finished floor. This calculator brings these variables together for the four types most often compared for homes in Singapore: solid timber, engineered timber, laminate and mosaic parquet.

Most homes in Singapore are HDB flats or private condominiums, and both have their own renovation rules. Kitchens, bathrooms and balconies are usually tiled, so timber or laminate normally goes in the living room, dining room and bedrooms. A 4-room HDB flat in Tampines, for example, may only need a timber floor in the living room and bedrooms, while a condominium in Bukit Timah may have one open-plan living and dining area that needs a single continuous floor.

The main difference from temperate climates is humidity. Indoor humidity stays high for most of the year, and air-conditioning dries the air at the same time, so timber expands and contracts as the room changes. Acclimatisation, subfloor preparation and the choice between a floating or glued fitting all depend on this, and the explanation below covers each one.

Use the result as a budgeting tool, not as a quote. Enter the material price and the installation quote you have received, and keep a contingency for surprises such as an uneven slab, which often shows up only once the old floor is lifted.

The result updates automatically.

Net area of the room, excluding furniture

Reference value for this type and quality. Adjust to match the quote you've received.

Leave blank to calculate materials only

Estimated total cost

$1,324

materials $924 + installation $400

Area with waste (10%)
22.0 m²
Material cost
$924
Installation cost
$400
Original area
20.0 m²

Turn this calculation into a quote for your client

We're building a tool for professionals. Be among the first to try it.

Share

How it works

1

Enter the floor area to be covered, in square metres.

2

Select the flooring type: solid timber, engineered timber, laminate or mosaic parquet.

3

Choose the quality grade. The reference price per m² fills in automatically.

Formula

C = A × (1 + D/100) × p + A × i
C — Estimated total cost (in Singapore dollars)
A — Floor area to be covered (m²)
D — Waste allowance (%), set by the laying pattern: straight or diagonal
p — Material price (Singapore dollars per m²)
i — Installation cost (Singapore dollars per m²), optional

How the calculation works

How to calculate flooring cost in Singapore

Budgeting for a new floor looks simple: multiply the floor area by the price per square metre and add the installation. In practice, three costs are often left out of the first estimate, and together they can push the final figure well above the original budget: offcut waste, installation labour and the materials that support the floor. This calculator covers the first two. The supporting materials, such as subfloor levelling, underlay, silicone sealant and threshold strips, are left for you to add to the budget.

Waste cannot be avoided. At the end of each row, boards must be cut to fit against the wall, and an offcut is not always long enough to start the next row. In a straight layout, with boards parallel to the walls, the calculator applies a waste allowance of 10%. In a diagonal layout, often chosen to make a narrow room or an irregular plan look more open, the cuts at the ends are angled, so the allowance rises to 15%. In a 25 m² room, that is 2.5 m² of extra material against 3.75 m², a difference that matters when flooring is bought in packs sold by area.

The four main types of flooring

Solid timber flooring is made from boards milled from a single piece of hardwood or softwood. Because the board is solid throughout, it can be sanded and refinished several times over its life, which makes it the most durable option when it is well maintained. The species and grade you choose affect both the price and the lead time, since some species are imported. Exotic species and hand-finished boards cost considerably more than common species. Solid boards are glued or nailed to the subfloor, which requires a skilled installer and a flat, dry base. Solid wood flooring boards are covered by EN 14342, which sets the general characteristics and marking requirements for wood flooring.

Engineered timber flooring has a thin top layer of hardwood bonded to a core of plywood or high-density fibreboard (HDF). The layered construction makes it more dimensionally stable than solid timber, so it copes better when humidity changes. It can be floated over an underlay or glued down. The price depends on the thickness of the top layer and on the species. Entry-level ranges sit close to the top end of laminate, while high-end ranges approach solid timber. Multilayer products are covered by EN 13489.

Laminate flooring is not timber. It has a printed decorative layer bonded to an HDF core, and it imitates the look of wood, stone or ceramic. It is the most common choice for floating installation, because the boards click together over an underlay without glue. It cannot be sanded, so its life is shorter than timber's with normal use. Laminate is widely available in entry-level and mid-range lines, and premium lines have textured finishes that imitate aged wood. The product standard is EN 13329, which includes wear classes such as AC4 and AC5 for busier rooms.

Mosaic parquet is made of small solid timber strips laid in square panels. It is more common in older homes and heritage buildings. Mosaic parquet elements are covered by EN 13226, which applies to solid parquet elements with grooves and/or tongues. Installation is slow, because the strips are fixed individually to a level slab, and the final sanding and sealing add to the labour. The material price is comparable to mid-range solid timber and varies with species and strip quality.

Installation: factors that change the cost

Installation labour is a significant share of the total, especially for higher-quality floors. It falls into three levels.

Basic installation applies to laminate laid as a floating floor. The boards click together over an underlay, with no adhesive, no specialist equipment and no curing time. It is the least expensive labour.

Intermediate installation applies to engineered flooring, either floating or glued. A floating floor needs a level base and a suitable underlay. A glued floor needs a polyurethane adhesive and professional equipment, which raises the labour cost noticeably.

Specialist installation applies to solid timber glued or nailed to the slab, and to mosaic parquet. It needs a skilled installer, a fully level base, moisture control and, for parquet, sanding and final finishing. It is consistently the most expensive level of labour in this category.

Labour rates vary between contractors and between districts, and demand can be higher in some areas. Get several written quotes that state exactly what is included. To get the total cost, enter the installation quote you have received in the installation field. The installation cost is applied to the full floor area, so the waste allowance does not change it. The waste allowance applies only to the material price.

Preparing the base: the hidden cost

Installing over an unprepared base is one of the most expensive mistakes in a flooring job. An uneven slab or screed causes visible gaps and creaking joints over time. Check the maximum flatness tolerance stated in the installation guide of the product you choose, which is measured with a straight edge over a set length. Levelling is easy to leave out of early quotes, so ask the installer to state it explicitly.

For glued floors, measure the residual moisture of the slab or screed with a moisture meter before work starts, and compare the result with the maximum moisture stated in the product datasheet for glued installation. Newly plastered or newly poured slabs can hold more moisture than expected, and in Singapore's humid climate they can take longer to dry than the schedule assumes. Drying can take weeks, or the installer may need to apply a moisture barrier primer first.

Common mistakes to avoid

Buying without a waste allowance is the most frequent error. Buying exactly the floor area leaves no margin for offcuts. With a 10% allowance, a 20 m² room needs at least 22 m² of material. If you buy 20 m² and cut badly at one end, you may run out before the last row.

Ignoring the production batch is another. Boards of the same product from different batches can differ in colour or grain. Buy the whole job from one batch, and buy some spare boards for future repairs.

Skipping acclimatisation causes problems later. Timber, solid or engineered, should be stored in the room where it will be laid for a few days before fitting, following the time stated in the manufacturer's installation guide. Fitting it straight from the store can cause boards to buckle or gap within months. Laminate with an HDF core is more tolerant, but its installation guide should still be checked for an acclimatisation time.

Laying timber in wet areas is a mistake. Constant wetting damages timber even with a protective finish, particularly at the joints. Porcelain or ceramic tile, or vinyl rated for wet areas, is the usual choice for bathrooms. In kitchens, engineered boards or laminate with a higher wear class can be used with care around the sink.

Renovation rules and approvals

Renovation rules differ between HDB flats, private condominiums and landed houses. Before you hack existing screed, change the floor level or alter a wet area, check the current renovation guidelines with HDB or, for a condominium, with the MCST. Ask HDB or the MCST which working hours apply to noisy works, and confirm the schedule with your contractor. The EN standards named above are European references, and local rules in Singapore may add requirements, so confirm them with HDB, the MCST or your renovation contractor.

Measuring the area correctly

Measure each room separately. For irregular rooms, split the plan into rectangles, measure each one and add the results together. Only subtract areas that will not be floored, such as a fixed built-in unit, and check whether the boards will run beneath it. If your plans give the area in square feet, divide by about 10.76 to get square metres.

When to use this calculator

Use this calculator to compare flooring types and to set a realistic budget before you ask for quotes. Do not treat the result as a final price. It does not assess the condition of the slab, the access to the flat for deliveries, or the specific product you choose. Compare the result with written quotes, and adjust the price and installation fields to match them.

Frequently asked questions

How much does flooring cost per m² in Singapore?

Cost varies widely by type. Laminate is usually the least expensive option and is widely available from large home-improvement retailers. Engineered timber sits in the middle, and its price depends on the thickness of the top layer and the species. Solid timber is the most expensive, with wide variation by species and finish. Prices change often and depend on the supplier and the grade, so enter the current price from your quote in the calculator and add the installation cost separately. Installation can be a large share of the total for mid-range and high-end floors, so do not leave it out of the budget.

What is the difference between solid and engineered timber flooring?

Solid timber is one piece of hardwood or softwood throughout its thickness. It can be sanded and refinished several times, which gives it a long service life when it is well maintained. Engineered timber has a thin top layer of hardwood over a core of plywood or fibreboard. The layered construction makes it more stable when humidity changes, which matters in a climate where air-conditioned rooms and humid outdoor air meet at every door. Engineered boards can be floated over an underlay, so they suit homes where a glued floor is impractical. Multilayer products are covered by EN 13489.

Should I lay the boards straight or diagonally?

A diagonal layout can make a narrow or irregular room look more open, but it creates more cuts. The calculator applies a 10% waste allowance for a straight layout and 15% for a diagonal one. In a 20 m² room, the difference is 1 m² of extra material. Diagonal laying also takes longer, so labour is usually higher. If you are unsure, ask two installers to quote both options before you choose.

Can I install timber flooring in a bathroom or kitchen?

Not in a bathroom. Constant exposure to water damages timber, even with a protective finish, and the joints are the weak point. In a kitchen, engineered boards or laminate with a high wear class can be used, but take care around the sink and dishwasher and wipe up spills promptly. Laminate rated AC4 or AC5 under EN 13329 is the usual choice for busy rooms. For wet areas, porcelain or ceramic tile, or vinyl rated for wet use, is the more suitable choice. Check the datasheet for the product's stated limits.

How much does flooring installation cost in Singapore?

Installation cost depends on the type of floor and how it is fitted. A click-together laminate floor laid over an underlay is the least labour-intensive. Engineered flooring is more demanding when glued, and solid timber or mosaic parquet fixed to a slab needs a specialist installer, a level base and moisture control. Labour rates vary between contractors, so get at least three written quotes and check that each one includes subfloor levelling, underlay, silicone sealant and threshold strips. Enter the chosen quote in the installation field to see the total cost.

When should I hire a specialist to install flooring?

For laminate laid as a floating floor, an experienced DIY enthusiast can usually manage, because the product's installation guide sets out each step. For solid timber, glued engineered boards or mosaic parquet, hire a specialist installer, since levelling, adhesive choice and moisture control need experience. Before work starts, check whether your renovation needs approval from HDB or, for a condominium, from the MCST. Ask HDB or the MCST which working hours apply to noisy works, and confirm the schedule with your contractor.

View all Paint & Coatings calculators →

By RivoCalc · Reviewed under our editorial methodology · Updated 6 June 2026

This calculator gives an estimate for budgeting only. Real costs depend on the property, the chosen product, the contractor and site conditions, such as the condition of the existing floor. It is not a quotation and does not confirm whether renovation works need approval.