Roof area calculator for sloped roofs

Works out the true sloped area of a roof from its plan dimensions and pitch, so you can order tiles, sarking and sheeting accurately.

A roof with a 100 m² plan area and a 30% pitch (about 16.7 degrees) has a true sloped surface of about 104.4 m². At 45% (about 24.2 degrees), the same footprint gives about 109.7 m². The plan area of a house always understates the roof you have to cover, and ordering from it is a common reason a job runs short of tiles or sarking.

Roof area is the starting point before you buy anything for the roof itself. Roof tiles or sheeting, sarking, insulation, battens, ridge capping, valley flashing and gutters all depend on it. The costliest mistake is using the floor plan footprint instead of the sloped area. On an 80 m² plan with a 35% pitch, the difference is about 4.8 m², which can mean a second delivery or a wait while more stock arrives. Eaves that overhang the walls count too, because they are part of the roof you have to cover.

This calculator converts the plan dimensions into the true sloped area with the formula A = C × L × √(1 + (p/100)²). It works for a single-pitch roof on a verandah, carport or granny flat, for a gable roof with two planes (one of the most common forms on Australian houses), and for a hip roof with four planes. The formula is the same for all three types, provided every plane has the same pitch.

Enter the length and width in plan, the pitch as a percentage, and the number of roof planes. The calculator shows the sloped area, the slope factor, the estimated ridge height and, if you want it, the area with a wastage allowance. Use the sloped area with wastage as the basis for ordering, and check the final figures with your roofer or supplier.

The result updates automatically.

Parallel to the ridge — eave to eave

Perpendicular to the ridge — eave to eave

30% means it rises 30 cm for every horizontal metre (3.6 in per foot). Typical values: 25 to 45%.

10% for simple roofs; 15% for multiple faces with valleys.

Total sloped area

83.5m²

4.4% more than the plan area of 80.0

Area with a 10% allowance

91.9m²

the quantity to use when ordering materials

Plan area
80.0 m²
Pitch factor
×1.0440
Ridge height
1.20 m
Increase over the plan area
+4.4%

Turn this calculation into a quote for your client

We're building a tool for professionals. Be among the first to try it.

Share

How it works

1

Measure the length and width of the roof in plan, from the outer edge of one eave to the outer edge of the opposite eave, in each direction.

2

Enter the pitch as a percentage. For example, 30% means the roof rises 30 cm for every metre of horizontal run. If your plans show degrees, convert them first.

3

Select the number of roof planes: single pitch, gable (two planes) or hip (four planes). The sloped area uses the same formula for every type.

Formula

A = C × L × √(1 + (p/100)²)
A — Sloped roof area, the true surface to be covered (m²)
C — Length in plan (m), measured parallel to the ridge
L — Width in plan (m), measured perpendicular to the ridge
p — Roof pitch as a percentage (%): metres of rise per 100 metres of horizontal run, equal to tan(angle) × 100
√(1 + (p/100)²) — Conversion factor from plan area to sloped area (always 1 or more)

How the calculation works

How to work out the real roof area in Australia

The roof area is almost never the same as the plan area of the house, and the gap grows with the pitch. A roof with a 30% pitch (about 16.7 degrees) has a sloped surface 4.4% larger than its footprint. At 45% (about 24.2 degrees) the surface is 9.7% larger. On a 100 m² footprint, that is 4.4 m² of extra roof at 30% and 9.7 m² at 45%. Every extra square metre has to be covered, so roof tiles or sheeting, sarking, battens and gutter length all need to be ordered from the sloped area, not the plan.

The calculation rests on basic trigonometry. Take a horizontal run of 100 m and a rise of 30 m, which is a 30% pitch. The slope line is √(100² + 30²) = 104.4 m long, so the sloped length is 1.044 times the horizontal run. A plane with a constant pitch scales in the same way in every direction, so its area scales by the same factor: area = plan area × √(1 + (p/100)²). At 30% the factor is √1.09 ≈ 1.044, and at 45% it is √1.2025 ≈ 1.097.

A worked example for a Sydney brick veneer house

Take a brick veneer house in Sydney with a gable roof, 12 m long and 8 m wide in plan, at a 25% pitch. The plan area is 12 × 8 = 96 m². The factor at 25% is √(1 + 0.25²) = √1.0625 ≈ 1.031, so the sloped area is 96 × 1.031 ≈ 99.0 m². The extra 3.0 m² is the roof you would miss by ordering from the plan area alone, before any wastage is added. Adding a wastage allowance on top of 99.0 m² gives the quantity to order.

Why one formula covers every roof shape

The same factor works for all common roof forms because the pitch is the same on every plane. A plane at a constant angle has a sloped area equal to its plan area divided by the cosine of that angle, and dividing by the cosine is the same as multiplying by √(1 + (p/100)²). So the factor applies to each plane in the same way, and the total sloped area of the roof is the plan area of the whole roof multiplied by the factor.

This holds for a single-pitch roof, for a gable roof with two planes meeting at the central ridge, and for a hip roof with four planes. On a hip roof the two long planes are trapezoidal and the two short end planes are triangular, but all four share the same pitch, so each one's share of the plan area scales by the same factor. The total is still the plan area multiplied by the factor.

The rule stops applying when the planes do not share a pitch. A steeper south-facing plane combined with a flatter north-facing plane for solar panels is a common Australian example. In that case, calculate each plane separately with its own pitch and add the results. The calculator assumes one pitch for all planes.

Pitch in degrees or in percentage

Australian plans, roofing specifications and builders usually give roof pitch in degrees. The formula uses a percentage, which is the rise in metres for every 100 metres of horizontal run. The two scales are different, so entering a value in degrees as a percentage produces a large error. A pitch of 30 degrees is about 57.7%, not 30%. To convert, use tan(angle) × 100:

  • 11.3 degrees is 20%
  • 16.7 degrees is 30%
  • 19.3 degrees is 35%
  • 22.5 degrees is about 41.4%
  • 24.2 degrees is 45%
  • 45 degrees is 100%

To measure the pitch of an existing roof without an inclinometer, place a 30 cm spirit level on the roof surface and lift one end until the bubble is centred. Measure the gap between the lifted end and the roof surface in centimetres, divide it by 30 and multiply by 100. The result is the pitch in percentage. Measure at several points on the roof, because a roof that has sagged or been re-sheeted may not have one uniform pitch.

Common roof types in Australia

Single-pitch (skillion) roofs. One sloping plane, common on verandahs, carports, sleep-outs, granny flats and rear extensions. The height difference between the high and low edges equals the width of the plane multiplied by the pitch as a percentage. For a 4 m wide verandah at 25%, the difference is 1 m.

Gable roofs. Two planes meet at a central ridge. The height of the ridge above the eaves equals half the plan width multiplied by the pitch as a percentage. For an 8 m wide house at 35%, the ridge sits 1.4 m above the eaves.

Hip roofs. Four planes slope down to the walls, and the ridge is shorter than the full length of the building. The area is calculated in the same way as for a gable roof. The ridge height is set by half of the shorter plan dimension multiplied by the pitch, so an 8 m by 12 m hip roof at 35% has its ridge about 1.4 m above the eaves.

Common mistakes to avoid

Using the plan area as the roof area. This is the most frequent and most expensive error. An 80 m² footprint at a 30% pitch has a sloped area of about 83.5 m², so ordering from 80 m² leaves about 3.5 m² uncovered before any wastage. Ordering short can mean an urgent second order with a delay, and tiles from a second batch may not match the first in colour. If a quote is based on the plan area, ask how the area was measured.

Confusing degrees with percentage. The two units are not interchangeable. Check the unit on your drawings before you enter the pitch.

Measuring along the slope instead of in plan. The length measured along the slope is always longer than the horizontal run. If you measure the roof surface directly, you already have the sloped dimensions, and the area is simply the sloped length multiplied by the sloped width, with no factor. This calculator works from plan dimensions. If you measured the surface directly, use that figure as the final area.

Leaving out the eaves. Eaves that project beyond the walls add roof area. Measure the plan from the outer edge of the eave on one side to the outer edge on the other, not from the face of the wall.

Checking your result

A quick check helps catch input errors. The sloped area can never be smaller than the plan area, because the factor is always 1 or more. If the result is only slightly larger than the plan area, the pitch you entered is probably low. If it is much larger, check whether a degree value was entered as a percentage. A 45% pitch gives a factor of about 1.097, while a 45 degree pitch gives a factor of about 1.414, so the difference is large and easy to spot.

When to use this calculator, and when not to

Use this calculator for quantity take-off, budgeting and checking quotes. It is a sound basis for ordering roof covering, sarking, battens and gutters for a roof with one pitch. It does not suit roofs with planes at different pitches unless each plane is calculated separately. Dormers, skylights, curved roofs and complex valleys need their own measurement, and the openings for skylights should be added or deducted as separate items. Do not use the result for structural design. Loads, rafter sizing and bracing depend on the design, not on the sloped area alone.

Local rules and when to bring in a professional

The sloped area supports budgeting and checking quotes, but it does not replace a roof design. For a full re-roof or a new roof, a licensed roofer or building designer checks the framing (trusses or rafters and the battens they carry), whether the pitch suits the chosen tile or sheet profile, the sarking, and the flashings at ridges, valleys, hips and eaves. Before you buy, check the minimum pitch listed in the technical data for the tile or sheet you choose.

Building work in Australia is regulated by the National Construction Code (NCC), which is published by the Australian Building Codes Board. Each state and territory applies the NCC through its own building legislation, so the rules for a roof replacement, a change of pitch or a structural change depend on where the house is. Whether approval is needed also depends on the type of work, so check with the local council or a registered building certifier before you start. Heritage and planning overlays can also limit roof material and colour, and heritage-listed buildings can have extra controls.

In older homes, inspect the timber framing for termite damage, rot and decay before any work starts. Damage hidden under old sheeting or tiles is one of the most common reasons a roof job grows in scope, and it changes the quantities you need to order.

Frequently asked questions

How do I convert the plan area of a roof to its sloped area?

Multiply the plan area by the factor √(1 + (pitch%/100)²). At a 30% pitch the factor is √1.09 ≈ 1.044, so the sloped area is 4.4% larger than the plan area. At 45% the factor is about 1.097, a 9.7% increase. For example, a roof with an 80 m² plan area at a 35% pitch has a sloped area of 80 × √1.1225 ≈ 80 × 1.059 ≈ 84.8 m². If your plans show the pitch in degrees, convert it first using tan(angle) × 100.

What is the difference between roof pitch in percentage and in degrees?

A percentage pitch is the rise in metres for every 100 metres of horizontal run. Degrees measure the angle itself. The two are not interchangeable: 30% is about 16.7 degrees, while 30 degrees is about 57.7%. Australian plans and builders usually give pitch in degrees, so check the unit on your drawings before entering the value. A 22.5 degree pitch is about 41.4%, and a 45 degree pitch is 100%. The calculator takes the pitch as a percentage.

Does the formula work for hip roofs?

Yes, exactly as it does for single-pitch and gable roofs, as long as every plane has the same pitch. Each plane slopes at the same angle, so its sloped area is its plan area multiplied by the same factor, and the planes add up to the whole roof. The formula does not hold where planes have different pitches, such as a steeper south-facing plane and a flatter north-facing plane for solar panels. In that case, calculate each plane with its own pitch and add the results.

Why does the roof area matter when ordering materials?

The sloped area is the basis for quantities of roof tiles or sheeting, sarking, insulation, battens, ridge capping and gutters. Ordering from the plan area understates what you need, which can mean a second order in the middle of the job and a risk of colour variation between batches of tiles. Add a wastage allowance on top for cuts, valleys and hips. Higher allowances suit hip roofs and roofs with many valleys. Confirm the final figures with your roofer or supplier, who will apply the cover and overlap rules for the product you choose.

When should I hire a roofing specialist?

For a full re-roof or a new roof, the area calculation supports budgeting and checking quotes, but it does not replace a roof design. A licensed roofer or building designer checks the framing (trusses or rafters), whether the pitch suits the tile or sheet profile, the sarking, and the flashings at ridges, valleys and eaves. In older homes, inspect the timber framing for termite damage, rot and decay before any work starts, because hidden damage often changes the quantities you need to order.

Do I need approval to replace my roof?

It depends on the state or territory, the type of work and the property, so there is no single national rule. Building work across Australia is regulated under the National Construction Code, which each state and territory applies through its own legislation. Check with your local council or a registered building certifier before you start, and ask whether heritage or planning overlays limit the roof material or colour.

Related calculators

By RivoCalc · Reviewed under our editorial methodology · Updated 12 May 2026

This calculator gives estimates for quantity take-off and budgeting only. Real quantities depend on roof shape, tile or sheet profile, cover, overlap and wastage, so confirm them with your roofer or supplier. It does not replace a roof design or a building approval, and it should not be used for structural decisions. Check with your local council or a registered building certifier before any change to the roof's pitch or structure.