Kitchen Renovation Cost Calculator Singapore
Estimates kitchen renovation cost in Singapore from floor area, scope of works, finish quality, cabinetry and appliances.
For a mid-range renovation of a 10 m² kitchen, the physical scope is 10 m² of new floor tiling, about 4 linear metres of cabinetry with a worktop, and, if appliances are included, five units to install and connect: an oven, a hob, a cooker hood, a fridge and a dishwasher. These quantities are what a contractor measures first, and they are the starting point for the estimate.
The variable that changes the scope most is not the floor area but the type of works. In a cosmetic renovation the existing wall tiles and cabinets stay in place, and the work is limited to repainting with mould-resistant paint suited to kitchens, replacing cabinet handles, adding under-cabinet lighting and, if needed, a new mixer tap at the sink. In a full renovation, where the water point or drainage is moved, the floor and wall tiles must be hacked off to reach the pipes, and that demolition becomes part of the scope. The finish quality of tiles, cabinetry and appliances is the second axis of variation.
The setting matters too. A four-room HDB flat in Tampines, a condominium kitchen in Bukit Timah and a landed house in Bishan can have similar floor areas and very different constraints. HDB flats follow HDB's renovation guidelines on hacking and wet works, condominium works that touch shared pipes need approval from the management corporation, and landed houses often have more area to tile.
Enter the kitchen area, the type of renovation and the finish quality. The calculator returns a total estimate split into works, cabinetry and appliances, so you can see which line moves the figure most. Treat the result as a planning range rather than a quotation: the final figure depends on what is found once the old tiles come off.
The result updates automatically.
Small kitchen: 6–9 m² (about 65–97 sq ft). Medium kitchen: 10–14 m² (about 108–151 sq ft). Large kitchen: 15+ m² (about 161+ sq ft).
Demolition, tiling, plumbing and labour. Reference cost for the Singapore market by scope of works and finish quality: base cost per m², cabinetry and appliances. Enter your own quotations to refine the estimate. Renovation works in Singapore follow the Building Control Act and HDB or management corporation rules, which vary by building type.
Cabinets, worktop and fitting. Reference value for the quality you've chosen.
Oven, hob, extractor, fridge and dishwasher. Reference value for the quality chosen.
Estimated cost
Mid-range · Mid-range · 10.0 m²
- Building work and base materials
- $3,900
- Kitchen cabinetry
- $4,750
- Cost per unit of area
- $865/m²
How it works
Formula
How the calculation works
Kitchen Renovation Cost: what drives the budget in Singapore
Renovating a kitchen is one of the most involved works a homeowner in Singapore takes on. Unlike repainting a room or replacing a floor, a kitchen renovation brings almost every trade in at once: a plumber, an electrician, a tiler, a carpenter or cabinet installer, and often a fabricator for the worktop. Coordinating that many trades in a space of about 10 m² is the main reason budgets grow, and the main reason surprises are common once walls and tiles come down.
This calculator estimates the total cost from three components: the base works per square metre, the cabinetry and the appliances. The base works figure covers labour for hacking, waterproofing, tiling, basic plumbing and the electrical work that supports the kitchen, together with construction materials. The formula is deliberately simple, so each input can be checked against a quotation line by line.
The three types of renovation
A cosmetic renovation is the quickest and least disruptive option. It keeps the existing wall tiles and cabinets, and the work is limited to repainting with mould-resistant paint suited to kitchens, replacing cabinet handles, adding under-cabinet lighting and, where needed, replacing the mixer tap at the sink. Choose this route when the layout works and the tiles are in sound condition. Its cost is the lowest of the three, and its visual effect is the most limited.
A mid-range renovation is what most homeowners mean when they say they are renovating the kitchen. It includes removing the existing wall and floor tiles, levelling the substrate with screed where needed, waterproofing the wet-area surfaces, laying new ceramic or porcelain tiles, and replacing the cabinetry. Its cost depends mainly on the area, the range of materials and the length of the cabinetry run.
A full renovation covers everything above and adds changes to the layout. Typical examples are relocating the sink and its drainage, adding a water point for a dishwasher, upgrading the electrical supply with dedicated circuits for high-demand appliances such as induction hobs and ovens, and, in some homes, removing or building a wall to open the kitchen to the living room. Because it involves the most trades and the most approvals, it is the most expensive option for the same area and finish quality.
Cabinetry: the largest variable item
In most mid-range and full renovations, cabinetry is the item that varies most in price. Budget cabinetry usually means modular flat-pack units from large home furnishing stores, with a limited range of door finishes and standard widths. Mid-range cabinetry offers better moisture resistance, more finish options and more adjustable dimensions, at a clearly higher cost for the same run. Premium cabinetry is made to measure by a specialist carpenter or interior designer, with quartz or natural stone worktops and integrated hardware from established European manufacturers. It gives full control over layout and materials.
The cabinetry input includes installation. If the existing cabinets stay, set this input to zero and the estimate covers the works and appliances only. When comparing quotations, check that the worktop, the end panels, the plinth and the installation are priced in the same line, because quotes often differ on these items rather than on the boxes themselves.
Appliances: buy as a package or separately?
Many homeowners buy built-in appliances together with the works, so that the oven, hob and cooker hood match the cabinet openings exactly. The appliance input covers an oven, a hob, a cooker hood, a fridge and a dishwasher. Like cabinetry, appliances fall into budget, mid-range and premium tiers, and the difference is usually in build quality, energy rating and features rather than in function. Setting the appliance input to zero assumes the existing appliances stay.
Built-in appliances must suit the electrical supply and the circuit that feeds them. Built-in appliance installation is not included in the cabinetry cost. Connecting a built-in oven or induction hob usually requires a dedicated circuit, and the work must be done by a licensed electrical worker to the SS 638 code of practice for electrical installations. If a gas connection is involved, a licensed gas contractor is needed as well. These connections belong in the budget from the start, not as an afterthought.
What is usually missing from the first budget
Three categories of cost appear again and again in kitchen renovations, and they are often left out of the first estimate.
The first is finishing detail: transition strips between floor finishes, silicone at the worktop joints, skirting, recessed ceiling lighting to replace a central light, and an access panel for concealed plumbing. Each item is small, but together they add a meaningful sum if they were not priced at the start.
The second is structural and concealed condition. When old wall tiles come off, degraded plaster, moisture entering through a poorly sealed joint, or old pipes that are worth replacing while they are exposed are common findings. A prudent budget holds a contingency for these, and the size of that contingency should reflect the age and condition of the building. Older flats and buildings with a history of leaks usually justify a larger reserve than newer units.
The third is the cost of living away from the kitchen. A full renovation takes several weeks during which the kitchen cannot be used. Households without a second cooking area should plan for takeaway meals or a temporary arrangement, and that expense should appear in the planning, not only in the works.
Approvals and professional requirements
Approval requirements depend on the type of home and the scope of works, so check them before the contract is signed.
In HDB flats, renovation is governed by HDB's renovation guidelines. They set out which works need HDB approval and the rules on working hours for noisy works, so read them before the work starts and ask the contractor to show any approval that applies.
In condominiums, works that affect common property, shared risers or the building's drainage need approval from the management corporation. Works confined to the unit's own interior still need the management office to be told of the scope, so that noise and access can be planned.
Where walls are removed or built, or where the structure is affected, the works must be assessed by a qualified professional engineer and must comply with the Building Control Act and the BCA Approved Documents (BCA).
All electrical work must be carried out by a licensed electrical worker and must follow SS 638. The Energy Market Authority (EMA) regulates electrical safety. Confirm the contractor's licences and registrations before signing.
Common mistakes when using the estimate
The most frequent error is comparing quotations that cover different scopes. One quote may include hacking, waterproofing and cabinet installation, while another assumes the existing cabinets stay. Ask every contractor to itemise hacking, waterproofing, tiling, cabinetry, appliances, debris removal and cleaning.
A second error is using only the floor area. Wall tiling, usually behind the worktop and the cooking zone, is a separate measurement and often covers more area than expected. Measure it separately when comparing quotations.
A third error is assuming existing appliances fit new openings. If the appliance input is set to zero but the new cabinets are of a different width, the existing units may not fit, and that cost returns.
A fourth error is comparing totals without checking whether each quotation includes applicable taxes and fees. Confirm this for every quotation before comparing them.
A fifth error is ignoring lead times for custom cabinetry and imported appliances. These can extend the programme well beyond the physical works, so order them before the demolition begins.
When not to use this calculator
This calculator is designed for residential kitchen renovations. It is not suitable for commercial kitchens, which must meet food-service requirements that change the scope and cost. It does not replace a structural assessment where walls are altered, nor a quotation from a licensed contractor. It also does not model design fees, which are often a separate item in full renovations. Use it to plan the budget and to check quotations, not to set a fixed price.
Frequently asked questions
What determines the cost of renovating a kitchen in Singapore?
The main drivers are the floor area, the scope of works (cosmetic, mid-range or full) and the material and finish quality. A cosmetic refresh that keeps the tiles and cabinets is the least expensive option. A mid-range renovation with new tiles and cabinetry costs considerably more, and a full renovation that relocates plumbing or adds dedicated electrical circuits is the most demanding. Appliance choice and the building type also matter, since HDB flats, condominiums and landed houses have different approval and access requirements. Use the calculator with your own floor area and scope to get an estimate.
What does a full kitchen renovation include?
A full renovation usually covers hacking of the existing wall tiles and floor finishes, waterproofing of wet-area surfaces, new tiles, relocation of water points and drainage where needed, upgrading of the electrical supply for high-demand appliances, installation of new cabinetry and worktops, fitting of built-in appliances, and final finishing such as silicone sealing, skirting and ceiling lighting. Where walls are removed, the structural works must be assessed by a qualified professional engineer under the Building Control Act. Works typically run for several weeks, depending on material lead times and coordination between trades.
What is the difference between budget, mid-range and custom kitchen cabinetry?
Budget cabinetry usually means modular flat-pack units from large home furnishing stores, in a limited range of door finishes and sizes. Mid-range cabinetry offers better moisture resistance, more finish options and more adjustable dimensions, at a clearly higher cost for the same space. Custom cabinetry, made to measure by a specialist carpenter or interior designer, gives full control over layout, materials and finishes and sits in the premium segment. Use the finish quality selector to reflect the tier you expect. Ask every supplier for the material specification in writing so that quotes can be compared on like-for-like terms.
Is approval needed before renovating a kitchen in Singapore?
It depends on the type of home and the works. In HDB flats, check HDB's renovation guidelines (hdb.gov.sg) before starting, since they set out which works need HDB approval. In condominiums, works affecting common property, shared pipes or the building's drainage need approval from the management corporation. Where structural walls are altered, a qualified professional engineer must assess the works under the Building Control Act, and the BCA Approved Documents apply (bca.gov.sg). Confirm with the authority that governs your property before starting.
How long does a kitchen renovation take?
A cosmetic refresh takes two to five days. A mid-range renovation with hacking, waterproofing, tiling and new cabinetry usually takes two to four weeks, including curing time for screed and waterproofing membranes. A full renovation with relocated plumbing or electrical upgrades can take four to eight weeks, depending on lead times for cabinetry and appliances and on how well the trades are coordinated. Ask the contractor for a written programme showing the sequence of works, and plan for an alternative cooking arrangement while the work is under way.
Should I renovate my kitchen before selling a property?
It often helps, but the return depends on the property segment and market conditions at the time. A refreshed kitchen can make a home easier to present, which matters most in competitive sales. Because a cosmetic refresh changes the look without structural work, it is usually the lowest-risk option before a sale. A premium finish is justified mainly where the rest of the property sits in a similar price band. Ask a property agent for their view of the local market before committing to structural works.
Related calculators
Tile Quantity Calculator for Walls and Floors
Calculates how many tiles you need for a wall or floor, including a waste allowance for cuts and the number of boxes to order.
Renovation Cost per m² Calculator for Singapore
Estimate the total cost of a renovation or new build in Singapore from floor area, type of works, finish level and location.
View all Renovation & Systems calculators →
By RivoCalc · Reviewed under our editorial methodology · Updated 3 June 2026
This calculator gives an estimate only. Actual costs vary with the contractor, materials, site conditions, building type and approvals, so confirm the figure with written quotations from licensed contractors before committing to a budget.