Renovation Cost per m² Calculator for Singapore
Estimate the total cost of a renovation or new build in Singapore from floor area, type of works, finish level and location.
The total cost of a renovation or new build is estimated by multiplying the floor area in square metres by a reference cost per square metre and by a location factor. For a four-room HDB flat in Tampines of about 90 m², every extra 10 m² of floor area raises the estimate by about 11% when the rate and the location factor stay the same, because area is a direct multiplier in the calculation. Floor area is the most predictable input; the rate per m² is where most of the uncertainty sits.
This calculator is built for how homes are renovated in Singapore. Most projects take place in existing homes: HDB flats built and managed by the Housing & Development Board, private condominium units, and landed properties such as terrace and bungalow houses. Full new construction is mainly relevant to landed houses and to owners rebuilding on land they hold. A Build-To-Order flat or a new condominium unit usually needs only interior fit-out, so the new build option is included mainly for landed properties. The result is a planning estimate, not a quotation.
Works fall into four types: new build, full structural renovation, interior renovation and minor works. A full structural renovation touches walls, floors, plumbing and wiring, while an interior renovation mainly changes finishes, the kitchen, the bathrooms and the false ceilings. The type of work usually has the largest effect on the result, followed by the finish level and the location.
The formula is C = A × c × r, where A is the floor area, c is the reference cost per square metre for the selected works and finish level, and r is the location factor. The three inputs act together in direct proportion, so a change of 10% in any one of them moves the total by 10%. This makes the result easy to test: change one input at a time to see which decision matters most for your project.
The estimate excludes professional fees, approval fees, GST, site supervision and temporary relocation. Budget these separately before comparing the estimate with contractor quotations, as explained in the sections below.
The result updates automatically.
Total usable living area
Reference value for this type of project and finish level. Adjust to match the quote you've received.
Estimated total cost
100 × $525
- Cost per unit of area (estimate)
- $525/m²
- Area used
- 100 m²
How it works
Formula
How the calculation works
How to estimate renovation or construction cost in Singapore
Budgeting a renovation or a new build is always an exercise in uncertainty. A contractor's final price depends on the condition of the property, the design, the extent of hacking and wet works, site access, the cost of labour when the quotation is prepared, and the contractor's own schedule. Before that detail exists, a homeowner needs an order of magnitude and a sense of which factors move the result the most. This calculator provides that starting point.
The result is a planning-stage estimate. It multiplies the floor area by a reference cost per square metre for the selected type of works and finish level, then applies a location factor. The reference rate is a benchmark, not a quotation, and the location factor is a relative adjustment for differences in labour and logistics costs across Singapore. Use the result to judge whether a project is viable and to set a realistic budget range, then replace it with written quotations as soon as the scope is clear.
How the formula works in practice
The calculation uses the formula C = A × c × r. C is the estimated total cost of the works, A is the floor area in square metres, c is the reference cost per square metre, and r is the location factor. Because the formula is multiplicative, each input scales the result in direct proportion. Doubling the floor area doubles the total, and a 10% change in the rate produces a 10% change in the total.
This has practical consequences. Floor area is the input you can measure most precisely, so the greatest uncertainty usually lies in the rate per m², which depends on the works and the finish. A useful exercise is to run the calculator for the same floor area with each type of works, and then for each finish level. The spread between the results shows how much your choices, rather than the size of the home, drive the budget.
The formula assumes that the floor area entered is the area affected by the works. If only the kitchen and two bathrooms are being renovated, entering the whole flat overstates the cost. Enter the area that will be touched by the works, or treat the result as an upper bound for a full renovation.
The four types of work
The type of work has the largest effect on the cost per m², and the four categories behave very differently.
- New build: covers foundations, structure, external and internal walls, roofing, all services (electrical, plumbing and ACMV, the air-conditioning and mechanical ventilation system) and complete interior finishes. It is relevant mainly to landed houses and to owners rebuilding on land they hold. Building works of this kind need plan approval under the Building Control Act before construction starts, and the structure dominates the budget.
- Full structural renovation: covers stripping out and rebuilding walls, floors, plumbing and wiring, usually in older private homes and landed houses. The real condition of the structure often becomes visible only once finishes are opened up, so this is the least predictable category. Allow a contingency for hidden defects, such as deteriorated concrete, corroded pipes or undersized wiring.
- Interior renovation: keeps the structure and the main services and renews flooring, wall finishes, false ceilings, painting, the kitchen and the bathrooms. This is the most common project for HDB flats and condominium units, where the structure and common services are not the owner's to change. Some works in HDB flats, such as hacking, need approval from HDB before they start. In condominiums, the management council sets its own rules on working hours, debris removal and lift use.
- Minor works: localised jobs such as repainting rooms, replacing a floor covering or repairing a single bathroom. These tend to have the lowest rate per m² because they involve a small part of the home and a limited range of trades.
Finish level: basic, mid-range and premium
The finish level is the second factor with the largest impact on the result. In practice, the three levels correspond to different material and labour choices:
- Basic: standard off-the-shelf materials from large DIY retailers, general contractor labour and no design consultant. This is typical for rental units and budget renovations.
- Mid-range: materials from established manufacturers with proven warranties, specialist trades for tiling, carpentry and plumbing, and often an architect or interior designer to plan the layout. This matches most owner-occupied homes.
- Premium: imported or designer materials, integrated smart-home systems, custom joinery and a full design team. This level is typical for high-end condominiums and landed houses.
Moving from basic to premium can change the cost per m² substantially, so choose the level that matches the project before reading the result. Do not compare a premium estimate with a basic quotation, and do not assume that a premium finish is needed to achieve a good result in a standard HDB flat.
Location: why the factor changes the result
The location factor reflects labour and logistics. Specialist trades, such as tilers, electricians and plumbers, are in demand across the island, and their rates vary between areas. Access also matters. A unit in a mature estate or a condominium in the central region may have narrow lift lobbies, limited loading bays and restricted working hours, which slow the work and add cost. Some outlying towns offer easier site access and more room for storing materials. Singapore is small, so the differences are narrower than those between regions of a large country, but they are real enough to affect a budget.
What the estimate does not include
The calculator covers construction work only. Budget the following items separately:
- Professional fees: an architect and, for structural work, a professional engineer. These are normally charged as a share of the works value, and the share depends on the scope.
- Approval and permit fees: charged by the relevant authority, depending on the works. Building plan submissions and HDB renovation permits are the usual examples.
- Site supervision: independent checks on quality and progress, especially useful for structural and wet works.
- Temporary relocation: if the home cannot be lived in during the works.
- GST: the Goods and Services Tax, administered by the Inland Revenue Authority of Singapore (IRAS) under the Goods and Services Tax Act 1993, is charged on many construction services and materials supplied by GST-registered businesses. Confirm with IRAS the rate in force and whether each quotation includes GST.
- Contingency: a reserve for hidden defects, particularly in older homes.
On larger projects these additional costs can represent a significant share of the works value, so include them in the overall budget from the start.
When to obtain formal quotations and approvals
The calculator gives an order of magnitude, which is a starting point for conversations with contractors and designers. For a real project, obtain at least three itemised quotations based on a clear scope of works and measurements prepared by a qualified person. Compare them line by line, because the same heading can hide very different quantities or specifications. A quotation that is much lower than the others often has a gap in its scope, and that gap usually returns later as a variation order.
Building works that need plan approval under the Building Control Act must be submitted by a qualified person, usually a registered architect or professional engineer. Contractors carrying out such works must be registered with the Building and Construction Authority (BCA). Minor works often need no plan approval, but they may still need notification or approval from HDB or the condominium management council. The requirements depend on the type of work and the type of property, so check them before signing a contract.
Structural design in Singapore follows the Eurocodes (EN) as adopted in Singapore, together with the Singapore National Annexes. Electrical installations follow SS 638, the code of practice for electrical installations, on a 230 V single-phase supply, and the Energy Market Authority (EMA) regulates electrical safety. Any electrical work should be carried out by licensed electrical workers.
Common mistakes
- Entering the whole floor area when only part of the home is renovated. This overstates the cost, as explained above.
- Choosing a finish level that does not match the project. A basic finish paired with premium expectations leads to disputes and extra spending later.
- Leaving out professional fees, GST and contingency. These are the items most often forgotten when comparing the estimate with a real budget.
- Comparing the estimate with a quotation that excludes items. Demolition, debris removal, new fittings and protection of common areas are frequently left out of the lower quotations.
- Assuming the cheapest quotation offers the best value. Scope gaps are a common cause of cost overruns, so a detailed comparison matters more than the headline figure.
Summary
The calculator is most useful for setting an initial budget range, testing whether a scope is affordable and seeing which decisions move the figure. Use it early, then replace the estimate with written quotations based on a clear scope of works. Keep a contingency for the parts of the project that cannot be seen until the work starts, and confirm approval requirements with the BCA, HDB or your management council before any work begins.
Frequently asked questions
What determines the cost of renovating a home in Singapore?
The main drivers are the type of works (new build, full structural renovation, interior renovation or minor works), the finish level (basic, mid-range or premium) and the location, which affects labour and logistics costs. The condition of the property matters as well, because older homes often hide defects that appear only once finishes are opened up. The calculator uses the floor area and these three choices to produce a planning estimate. For a more accurate figure, obtain itemised quotations from registered contractors based on the same scope of works.
What does a full interior renovation of a four-room HDB flat include?
A full interior renovation of a four-room HDB flat typically covers new flooring and wall finishes, false ceilings, painting, a new kitchen, renovated bathrooms, and replacement of fittings such as electrical points and lighting. Where the works involve hacking, HDB approval is needed before work starts. Changes to structural elements also need approval, and all works must follow HDB renovation guidelines. Use the calculator with a floor area of about 90 m² and the interior renovation option to get a first estimate.
Why is renovation more expensive in central areas than in outlying towns?
Labour and logistics drive most of the difference. Specialist trades are in demand across Singapore, and getting materials and workers to a site costs more where access is restricted. Mature estates and central condominiums may have narrow lift lobbies, limited loading bays and restricted working hours, which slow the work. Outlying towns often offer easier site access. The location factor in the calculator reflects these differences in relative terms, and it should be checked against local quotations rather than treated as a precise figure.
What is the difference between a full structural renovation and an interior renovation?
A full structural renovation changes the physical structure and services of the home, which may mean stripping walls and floors back to the structure and replacing plumbing and wiring. An interior renovation keeps the structure and main services and renews the finishes, such as flooring, wall finishes, false ceilings, the kitchen and the bathrooms. Structural renovation carries a higher rate per m² and less predictable costs, because hidden problems often come to light during demolition. Choose the option that matches the scope of works in your quotation, and use the calculator to compare both scenarios for the same floor area.
What costs are not included in the estimate?
The estimate covers construction work only. It does not include professional fees for an architect or engineer, approval and permit fees, site supervision, temporary relocation during works, GST, or a contingency for hidden defects. On larger projects these additional costs can represent a significant share of the works value, so add them to the budget from the start. Ask each contractor to state whether its quotation includes GST and what is excluded, such as debris removal or new fittings.
When is a registered architect or engineer required for renovation works in Singapore?
Building works that need plan approval under the Building Control Act must be submitted by a qualified person, usually a registered architect or professional engineer. Works that do not need plan approval may still need notification or approval from HDB or the condominium management council, depending on the property. Check the requirements for your property and type of work with the BCA, HDB or your management council before you start, and make sure your contractor is registered with the BCA for the works being carried out.
Related calculators
Sand and Cement Calculator for Mortar
Calculates the number of cement bags and the sand volume for mortar, based on the area, layer thickness and mix ratio.
Garage Construction Cost Calculator, Singapore
Estimates the cost of building a garage on a Singapore landed property, from floor area, structure type, gate and electrical works.
View all Renovation & Systems calculators →
By RivoCalc · Reviewed under our editorial methodology · Updated 3 June 2026
This calculator provides an estimate for planning purposes only. Actual costs depend on the condition of the property, the design, the finishes chosen, site access, the contractor and market conditions at the time of quotation. Results are not a quotation. Confirm approval requirements with the BCA, HDB or your condominium management council before starting any works.